Waste360 is part of the Informa Markets Division of Informa PLC

This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC's registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.

Need to Know

U.S. EPA Sets Cleanup Dates for Landfill Containing Manhattan Project Waste

Article-U.S. EPA Sets Cleanup Dates for Landfill Containing Manhattan Project Waste

Getty Images radioactivefeat.png

The U.S. Environmental Protection Agency has set a date to begin remediation of radioactive waste located at the West Lake Landfill.

Clean-up will initiate at the landfill, located in Bridgeton, Mo. in March 2024. The radioactive waste was shipped to the site in the late 70s, buried and covered. It originated during the Manhattan Project in St. Louis.

One resident began advocating for the city after discovering odors in the air came from burning trash on the landfill site.

Read the entire article here.

Hide comments
account-default-image

Comments

  • Allowed HTML tags: <em> <strong> <blockquote> <br> <p>

Plain text

  • No HTML tags allowed.
  • Web page addresses and e-mail addresses turn into links automatically.
  • Lines and paragraphs break automatically.
Publish